help_outline Skip to main content
HomeCalendarDawkins Line Rail Trail

Calendar - Event View

This is the "Event Detail" view, showing all available information for this event. If the event has passed, click the "Event Report" button to read a report and view photos that were uploaded.

Dawkins Line Rail Trail

When:
Wednesday, March 13, 2024, 10:00 AM
Where:
Jane Beshear Trailhead
6270 Royalton Road
Salyersville, KY  41465
Additional Info:
Category:
Weekly Ride
Registration is not Required
Payment In Full In Advance Only

Directions from Lexington:

I-64 East to the Mountain Parkway East outside Winchester.

Mountain Parkway to exit #75, then right onto KY 7.

KY 7 to the trailhead in Royalton. (About 7 miles)



Primary ride leader: Mark Davidson, 859-749-2034  Additional ride leader Beth Jenkins

 

Distance: 35 or 50

Pace: B (14-16 mph); B/C (12-14 mph)

Terrain: 1 - Mostly Flat or railroad grades climbs/descents

Entirely on trail - no map or cue sheet required
The ride will have regrouping
Rain cancels - check bgcycling website "Forums" one hour before if unsure
Restroom facilities are available at the starting location
There will be a store stop

 

Overall Difficulty:

Moderate

 

Details:

You have two options for this ride: the out and back to Hager Hill will be 35 miles. Need more miles? Ride to the Tip Top Tunnel and back for a total of about 50 miles.  

The Dawkins Line Rail Trail is now paved from end to end, as of April 2023. Fresh asphalt means smooth riding. Starting point is the Jane Beshear trailhead parking lot in Royalton. Climbs and descents are all railroad grade, so nothing too steep. Marathon station store available at Hager Hill (halfway point of the 
35 mile route). (They have corn dogs!) The Griffith Family Farm store is also available for lunch stop as desired. Food and more! (They have awesome molasses cookies) Wheels roll at 10:00 am to avoid later day heat as much as possible. 

This route is entirely on the rail trail.