help_outline
Skip to main content
Print This Page
Text Size
Scroll To Top
Share This Page
Share this page on Facebook
Share this page on Linkedin
Share this page on Twitter
Member Login
My Shopping Cart
Shopping Cart
cancel
Menu
Home
About Us
About Us
History
Philanthropy
Member Benefits
Join Us
Education
Ride Key
Paceline Guidelines
Five Ways to Get Faster
Hills
New Cyclists
Signature Events & Programs
Horsey Hundred
Red River Rally
Pedaling for a Purpose
Calendar
Home
Calendar
Red River Peaks and Valleys
{1}
##LOC[OK]##
{1}
##LOC[OK]##
##LOC[Cancel]##
{1}
##LOC[OK]##
##LOC[Cancel]##
Calendar
- Event View
This is the "Event Detail" view, showing all available information for this event. If the event has passed, click the "Event Report" button to read a report and view photos that were uploaded.
Return to Grid View
Show Search
Today
Red River Peaks and Valleys
When:
Wednesday, October 18, 2023, 10:00 AM until 2:30 PM
Where:
Shiloh Community Church
2652 Campton Road
Stanton, KY 40380
Additional Info:
Category:
Weekly Ride
Registration is not Required
Payment In Full In Advance Only
Cancellation Policy:
Primary ride leaders: Mark Davidson (859)749-2034; Paul Rawlings (859) 619-2713
Distance: 57 miles
Pace: high B pace; low B pace
Terrain: Rolling hills alongside Red River, significant climbs to Nada Tunnel and up Subway Hill to Pine Ridge.
Overall Difficulty: Strenuous to very strenuous - more than 3,300 ft of climbing
Ride will have regrouping.
Rain cancels - check Forum on bgcycling.net one hour before if unsure.
https://www.bgcycling.net/content.aspx?page_id=2154&club_id=740127&item_id=11721
No restroom facilities at the start.
There are store stops available at mile 20 and mile 27.5.
There are no stores the final 30 miles.
This ride is all on pavement.
The ride begins at Shiloh Community Church, crosses over Red River immediately and follows it upriver to Route 77 at the Iron Bridge where it climbs up the backside of Nada Tunnel (please bring a light for the tunnel) down to Route 15 and into Slade for a store stop. From Slade we climb three miles up the Subway Hill and ride to Pine Ridge where The Brick coffee shop is available at mile 27.5 for a break and snacks. This is the last store stop available along the route. Into the Red River Gorge from Pine Ridge, out to Sky Bridge, CAREFULLY and CAUTIOUSLY down Sky Bridge Hill and ride on the north side of Red River all the way back to the starting location.
57 miles.
All Covid-19 precautions/rules are in effect.
Map of route:
https://ridewithgps.com/routes/42594370